Thermal Power

Anuppur Thermal Powerproject

The thermal arm is developing 2520 MW coal based Thermal Powerproject in Anuppur district, Madhya Pradesh. The project is planned to be executed in two phases as follows:

Phase - 1 : 1200 MW (2X600 MW)

Phase - 2 : 1320 MW (2X660 MW)

Highlights

  • The Phase-I of 1200 MW (2X600 MW) through its SPV (Special Purpose Vehicle) i.e. MB Power Madhya Pradesh Limited (MBPMPL) has been commissioned & under commercial operation since April 2016;
  • Coal for the project is being sourced from South Eastern Coalfields and water sourced from River Son;
  • Direct connectivity of the Project to the National Grid to enhance reliability, economy and minimize system losses;
  • 85% of power tied up with distribution utilities of Uttar Pradesh, Madhya Pradesh & Haryana under long term as well as medium term PPA; balance power is being sold through bilateral arrangements and through power exchanges;
  • In the last FY 2018-19, the Plant is operating at an average annual availability of more than 85% since declared under commercial operation
  • FGD implementation schedule for Phase-I – Unit 1: March 2022; Unit 2: June 2022;
  • Robust CSR policy in place with various schemes for livelihood, health & sanitation, education & digital literacy program, vocational training centers, farm-based intervention schemes etc;
  • Almost 100% ash disposal on annual basis has been achieved in FY 2018-19 including almost 40% ash being lifted & utilized by cement manufacturers.